Tuesday, 2 August 2016

Slow day.

It has been a miserable day for weather today, all day, so perhaps not a bad day to be not cruising.
We finally decided to walk into Gnosall and had a fantastic fish and chips there. We will go back to that shop, as it was gluten-free as well.
I have spent a lot of the day on the phone. I tried to asked the canal and River Trust if it would be ok to stay on the five day moorings a bit longer as we have broken down, but the person I needed to speak to was meant to ring me back straight away, 3 hours ago, and I am still waiting.
RCR have been a bit better after two or three phone calls they gave us the option of having an original vetus part direct replacement and free on our cover, but it wouldn't arrive until the middle of next week. The other option is an electric pump fitted in line but we would have to pay that fitting charge as they obviously have to alter some of the connections.
We talked to Gordon, whose advice as always was superb, and he advised us to go for the electric pump so that is what is happening. All we need now is a date for it to be fitted and hopefully RCR will let us know that today.
As we walked down the canal, in the brief bit of fine whether I took this photograph of a typical shroppie bridge and also the cast iron fitting that was used to stop the horse ropes going into the stone.



Broken Down

Yesterday we made it to Norbury Junction.
It was a nice cruise of 5 hours and we are enjoying the Shroppie.
We got a lovely mooring.



Even better followed as we heard a steam whistle and wonderfully NB President was coming towards us.







What a great day. Moored up by a pub open all day that has a play area. And then .......

When cleaning the bilge I noticed the fuel pump was dripping fuel. I tried to get the people at Norbury Wharf to have a look but they were unavailable until Wednesday morning. So it's a call to RCR.
They attired within 2 hours and condemned the fuel pump. Today we will find out what is going to happen to replace it and how long we will be at Norbury Junction.
No phone signal and having to stand outside the pub to use their WiFi add to the complications.

Boating is slower paced but I would never despite it as stress free.

Sunday, 31 July 2016

On to the Shroppie

Today we made it onto the Shropshire Union Canal. Initially it is not how I imagined, I had thought it would be a very old contour canal, but quite the opposite it is a Thomas Telford canal therefore lots of straight sections with embankments and cuttings. Originally built to go to Liverpool.
It is also very difficult to moor at the side. The concrete construction has a below waterline shelf which means you cannot get into the side. We have found somewhere and are really pleased about that but someone who tried to more next to us couldn't get in. We shall have to remember this spot.



We have cruised for about 10 hours today, and very varied it has been too. We started off in Gas Street Basin at 8 o'clock and cruised through Birmingham out on the new mainline. Highlight of the trip, though it didn't photograph very well, was passing under Smethwick Galton Bridge.



I had to go down the weed hatch on two separate occasions, the first time removing plastic bags a kagoul and goodness knows what else. It was a horrible job. The second time there wasn't much there but we had significantly lost power. We had a couple of incidents of this but after some hard thrusts in reverse everything seemed back to normal for the rest of the trip. Quite worrying when the engine normally goes to two and a half thousand revs but on this occasion would only go to about 1000. We were barely making forward progress.

We came down we came down the Wolverhampton 21, which was hard work as two of the bridges needed Alison to pull the boat right over to the right hand side to maintain our chimney being in contact with the rest of the boat.



We thought once we were off the BCN that all of our problems with rubbish would be behind us. However at the first bridge on the Shropshire Union we came to this.



Tomorrow must be easier.

Saturday, 30 July 2016

Made it to Gas Street Basin

After a long cruise from the Drawbridge of 4 hours we made it to Gas Street Basin.



It was further than I remembered but luckily we arrived early enough to get a good mooring just short of the Worcester Bar.

It was lovely having lunch on board in the centre of our home city.



We went to l9ok at the views from the 7th floor of the library but it was noisy as there was a festival just outside.



We had a real surprise looking the other way, the mooring we were aiming for and which had been totally empty when we did a reccy two weeks ago was totally full.



I hope it's not this full when we are back in 3 weeks time for T20 finals day.

Now time to go to the wedding do we are invited to attend the Botanical Gardens.

Friday, 29 July 2016

Deja Vu

Today we did the same as last year for the third day running however tomorrow will be all new.

No locks today. We came through Wast Hill's tunnel on tick over following a slow boat so the 2726 yards underground took forever. But we successfully passed another boat inside with no disasters unlike Shrewley tunnel last year.

Down the Stratford canal to the requested Drawbridge pub. The children really enjoyed it last year. Km had an extra large chicken New Yorker and polished it off.

We also operated the drawbridge for another boat.



It is operated using this panel. Warning lights flash for 20 seconds. Then barriers come down and finally the bridge goes up.



When we operated it one moronic driver decided to ignore all the warnings and narrowly missing the descending first barrier drove onto the bridge but had to emergency stop at the second and found himself stuck on an opening bridge. I was very tempted to keep going but feared breaking the whole thing so hit the emergency stop to release the driver. What a plonker.

Anyway another happy and tiring day. Tomorrow we turn round and head for Birmingham city centre.

Thursday, 28 July 2016

Tardebigge in the rain AGAIN

We have still not done the 30 locks of Tardebigge in the dry. Maybe one day.
Today is Alison's birthday. We are celebrating by consuming vast quantities of pizza.
The day started with a view of a windmill.



Before ascending the locks.

We saw all sorts including children with no life jackets in the canal. Luckily they survived though I'm not sure it will be to the benefit of the gene pool.



Tardebigge is a right of passage but eventually we reached this.



Happily moored by Alvechurch marina and the Weigh Bridge pub we are enjoying guilt free eating having already burning off the calories.

Maybe one day we will do the flight in the sunshine.

Wednesday, 27 July 2016

The holiday begins.

Just like last year, our first day was coming from the Mirena and travelling fourteen locks towards Birmingham and a picturesque mooring basically in the middle of nowhere.
All has gone well, we set off a bit later and made good progress we are moored up, have done some repairs to

scratches and are about to settle down for the night. We have decided this year to use the microwave more to make quick meals which means we get more time together rather than an hour cooking a meal. That worked well though we do need our portable generator to do that. However it worked we've eaten, everybody's happy.
I got to do some locks today as Alison has done a steering coursr and felt more confident in maneuvering the boat. Interestingly the lock gear is very unique to this canal, amazing that it's over 200 years old.





As the sun goes down on our first day, we are all happy and looking forward to 31 locks tomorrow and hopefully a wedding in Birmingham on Saturday.